Hahn Air System H19239

Mumbai to Darbhanga

Mon, Nov 2

Access extensive flight status info directly on the app!

Delayed

BOM
Mumbai, Mon, Nov 2
09:15
Scheduled: 09:15
Check-in
--
Terminal
T1
Gate
--
waiting to departure icon
Departure
Flight time: 2h 30m
haven't arrived icon
Arrival
DBR
Darbhanga, Mon, Nov 2
11:22
Scheduled: 11:50
Baggage
--
Terminal
T1
Gate
--
Download app to track flight status
Google Play
4.8
★ ★ ★ ★ ★
504k reviews
App Store
4.9
★ ★ ★ ★ ★
36.2k reviews
Download app to track flight status

H19239 flight details

The aircraft model for flight H19239 is Plane model info unavailable, operated by Hahn Air System, and features -- seats.
Airline: Hahn Air System Plane model info unavailable Plane model info unavailable
Airline: Hahn Air System
Distance flown: --
Age: --
Seats: --
Meal service: unavailable
Wi-Fi: Unavailable
USB port: unavailable
Entertainment: unavailable
Recline angle: --
Seat width: --
Legroom: --

H19239 flight schedules

Flight H19239's latest flight is scheduled to depart at Sun, Oct 25 10:10 (local time) and arrive at Sun, Oct 25 11:30 (local time). The latest flight information is provided by Whatflytime.
Date Route Departure Arrival Aircraft Status
Sun, Oct 25 BOM - DBR
Actual: 09:25
Scheduled: 10:10
Actual: 11:25
Scheduled: 12:40
Plane model info unavailable Arrived
Fri, Oct 30 BOM - DBR
Actual: 12:26
Scheduled: 10:10
Actual: 14:31
Scheduled: 12:40
Plane model info unavailable Arrived
Wed, Oct 28 BOM - DBR
Actual:
Scheduled: 10:10
Actual:
Scheduled: 12:40
Plane model info unavailable Cancelled
Mon, Nov 2 BOM - DBR
Actual:
Scheduled: 09:15
Actual:
Scheduled: 11:50
Plane model info unavailable Delayed
Sat, Oct 31 BOM - DBR
Actual:
Scheduled: 09:15
Actual:
Scheduled: 11:50
Plane model info unavailable Cancelled
Thu, Oct 29 BOM - DBR
Actual: 13:36
Scheduled: 10:10
Actual: 15:39
Scheduled: 12:40
Plane model info unavailable Arrived
Date Departure Arrival Status
Sun, Oct 25
Actual: 09:25
Scheduled: 10:10
Actual: 11:25
Scheduled: 12:40
Arrived
Fri, Oct 30
Actual: 12:26
Scheduled: 10:10
Actual: 14:31
Scheduled: 12:40
Arrived
Wed, Oct 28
Actual:
Scheduled: 10:10
Actual:
Scheduled: 12:40
Cancelled
Mon, Nov 2
Actual:
Scheduled: 09:15
Actual:
Scheduled: 11:50
Delayed
Sat, Oct 31
Actual:
Scheduled: 09:15
Actual:
Scheduled: 11:50
Cancelled
Thu, Oct 29
Actual: 13:36
Scheduled: 10:10
Actual: 15:39
Scheduled: 12:40
Arrived

H19239 punctuality rate

H19239 will depart from Chhatrapati Shivaji Maharaj International Airport at Sun, Oct 25 10:10, arriving at Darbhanga Airport at Sun, Oct 25 11:30. The recent on-time departure rate is 33%. The recent on-time arrival rate is 33%. The average delay is 50m.
BOM (Chhatrapati Shivaji Maharaj International Airport) - DBR (Darbhanga Airport)
  • Departure:
    33% on time
  • Arrival:
    33% on time
  • Average delay:
    50min
Delayed
168m
126m
84m
42m
On time
25 Oct
28
29
30
31
1 Nov
H19239
Whatflytime is a global flight tracker that provides real-time status updates using trusted data from Trip.com. With multilingual support and worldwide coverage, it's your reliable source for up-to-date flight information.
Current language: English