Akasa Air QP1506

Mumbai to Guwahati

Fri, Sep 5
Tue, Sep 9

Access extensive flight status info directly on the app!

Arrived

BOM
Mumbai, Fri, Sep 5
06:28
Scheduled: 06:00
Check-in
--
Terminal
T1
Gate
26
departured icon
Departure
Flight time: 3h 20m
arrived icon
Arrival
GAU
Guwahati, Fri, Sep 5
09:21
Scheduled: 09:20
Baggage
--
Terminal
T1
Gate
--

Access extensive flight status info directly on the app!

Scheduled

BOM
Mumbai, Tue, Sep 9
06:00
Scheduled: 06:00
Check-in
--
Terminal
T1
Gate
--
waiting to departure icon
Departure
Flight time: 3h 20m
haven't arrived icon
Arrival
GAU
Guwahati, Tue, Sep 9
09:20
Scheduled: 09:20
Baggage
--
Terminal
T1
Gate
--
Download App to Track Flight Status
Google Play
4.8
504k reviews
App Store
4.9
36.2k reviews
Download App to Track Flight Status

QP1506 Flight Details

The aircraft model for flight QP1506 is Boeing 737 MAX 8, operated by Akasa Air, and features Up to 193 seats.
Airline: Akasa Air Boeing 737 MAX 8 Boeing 737 MAX 8
Airline: Akasa Air
Distance flown: --
Age: 1y, 2m
Seats: Up to 193
Meal service: available
Wi-Fi: available
USB port: available
Entertainment: available
Recline angle: 100°
Seat width: 46 cm
Legroom: 76 cm

QP1506 Flight Schedules

Flight QP1506's latest flight is scheduled to depart at Fri, Sep 5 06:00 (local time) and arrive at Fri, Sep 5 09:21 (local time). The latest flight information is provided by Whatflytime.
Date Route Departure Arrival Aircraft Status
Fri, Sep 5 BOM - GAU
Actual: 06:28
Scheduled: 06:00
Actual: 09:21
Scheduled: 09:20
Boeing 737 MAX 8 Arrived
Thu, Sep 4 BOM - GAU
Actual: 06:13
Scheduled: 06:00
Actual: 09:02
Scheduled: 09:20
Boeing 737 MAX 8 Arrived
Wed, Sep 3 BOM - GAU
Actual: 06:09
Scheduled: 06:00
Actual: 09:04
Scheduled: 09:10
Boeing 737 MAX 8 Arrived
Tue, Sep 2 BOM - GAU
Actual: 06:20
Scheduled: 06:00
Actual: 09:14
Scheduled: 09:10
Boeing 737 MAX 8 Arrived
Fri, Aug 29 BOM - GAU
Actual: 06:31
Scheduled: 06:00
Actual: 09:24
Scheduled: 09:10
Boeing 737 MAX 8 Arrived
Thu, Aug 28 BOM - GAU
Actual:
Scheduled: 06:00
Actual:
Scheduled: 09:10
Boeing 737 MAX 8 Delayed
Wed, Aug 27 BOM - GAU
Actual:
Scheduled: 06:00
Actual:
Scheduled: 09:10
Boeing 737 MAX 8 Delayed
Date Departure Arrival Status
Fri, Sep 5
Actual: 06:28
Scheduled: 06:00
Actual: 09:21
Scheduled: 09:20
Arrived
Thu, Sep 4
Actual: 06:13
Scheduled: 06:00
Actual: 09:02
Scheduled: 09:20
Arrived
Wed, Sep 3
Actual: 06:09
Scheduled: 06:00
Actual: 09:04
Scheduled: 09:10
Arrived
Tue, Sep 2
Actual: 06:20
Scheduled: 06:00
Actual: 09:14
Scheduled: 09:10
Arrived
Fri, Aug 29
Actual: 06:31
Scheduled: 06:00
Actual: 09:24
Scheduled: 09:10
Arrived
Thu, Aug 28
Actual:
Scheduled: 06:00
Actual:
Scheduled: 09:10
Delayed
Wed, Aug 27
Actual:
Scheduled: 06:00
Actual:
Scheduled: 09:10
Delayed

QP1506 Punctuality Rate

QP1506 will depart from Chhatrapati Shivaji Maharaj International Airport at Fri, Sep 5 06:00, arriving at Lokpriya Gopinath Bordoloi International Airport at Fri, Sep 5 09:21. The recent on-time departure rate is 73%. The recent on-time arrival rate is 91%. The average delay is 19m.
BOM (Chhatrapati Shivaji Maharaj International Airport) - GAU (Lokpriya Gopinath Bordoloi International Airport)
  • Departure:
    73% on time
  • Arrival:
    91% on time
  • Average delay:
    19min
Delayed
28m
21m
14m
7m
On time
22 Aug
26
29
2
3
4
5 Sep
QP1506
Whatflytime is a global flight tracker that provides real-time status updates using trusted data from Trip.com. With multilingual support and worldwide coverage, it's your reliable source for up-to-date flight information.
Current language: English